Oil Field Drilling Fluid
Background/Requirement
- Guar gum, a high viscosity thickener, highly hydrophilic and difficult-to-disperse without fisheyes
- Gum dispersion is pumped into the wells to displace oil for recovery from porous rock
- High capacity, single-pass dispersion into hot or cold water
Quadro's Approach
- ZC3 in-line disperser, skid mounted with a discharge PD pump arrangement for performance with high viscosities and high solids addition rates
- Simple VFD pump control to provide :
- Variable backpressure on ZC3 disperser controlling powder incorporation rate
- Steady control of discharge concentration
- Positive delivery of viscous gum dispersion to downstream processing
- Powder feed system to maintain full charge in powder hopper
- High/low level hopper detection with automated powder valve actuation
Summary
The traditional equipment choice to reduce the oil droplets is the Colloid Mill. When testing the Quadro Ytron Z Emulsifier vs. a colloid mill, the Z Emulsifier produces a product with a higher final viscosity.
[go back]
